The 25 Ottawa project was a complete renovation. This project consisted of the installation of 64 heat pumps throughout all five floors as well as exposed spiral duct work throughout the building.

The 25 Ottawa project was a complete renovation. This project consisted of the installation of 64 heat pumps throughout all five floors as well as exposed spiral duct work throughout the building.

