Pleune Service Company completed another boiler retubing job on an existing Cleaver Brooks boiler for a school system in Lansing. We removed 148 tubes from the boiler top pass. We then installed new roll sealed 2 ½ inch steel tubes. The boiler was pressure tested and reassembled for heating service this coming school year in fall 2021. A large steam trap survey was also completed in the classrooms and halls, with replacements to follow on failed traps. Our specially trained technicians are ready to assist on your next boiler project! Let us know

 

Tags:
[tags_no_comma_shortcode]

Other articles

Benefits of Utilizing Credit History Reports

Being Intentional Leads to Better Boiler, Deaerator Performance