New 2008 projects added

Recent Projects

Forest Hills Eastern H...
This project won a 2005 Associated Builders and Contracto...
TRW...
-Upgrade building ventilation system
-Replace six(6...
Pharmacia...
-30,000 sq. ft. Research & Development lab
-HVAC mec...

Contact Information

750 Himes Street SE
Grand Rapids, MI 49548
Phone: (616) 243-6374
Service:(616) 243-5434

24 Hr Service: 1-800-447-6907

More Contact Info

Pleune Projects

Forest Hills Eastern High and MiddleForest Hills Eastern High and Middle 2004
This project won a 2005 Associated Builders and Contractors Award of Excellence.

This project was unique in many ways. It consisted of four different phases totaling 312,000 square feet that utilized a number of mechanical rooms located throughout the school. The boiler room contained five "Thermo Solution" high efficiency boilers rated at 2 million BTU's each. The 32 ton York chiller that serves the complex is a packaged air-cooled outdoor unit located outside the boiler room along with three thermal ice storage tanks.

The main mechanical room is located on the mezzanine level and measurees 200' long x 25' wide x 28' high. The unique size of this room required extensive planning from all trades to install mulitple systems in a four tier layered arrangement. Supporting these mechanical layers while maintaining federal safety standards was a challenge in itself.

Also, the main mechanical room housed the bulk of the air handling distribution system, which consisted of seven York "AirPak" double-wall air handlers that had to be rolled in from one end and ten set in place. Pleune also instaled five "Des Champs" energy recovery ventilation units in this area to meet the necessary fresh air requirements.

This project was designed to meet or exceed LEED certification standards for materials and installation procedures.

TRWTRW 2005
-Upgrade building ventilation system
-Replace six(6) 40,000 CFM make-up air units
PharmaciaPharmacia 2005
-30,000 sq. ft. Research & Development lab
-HVAC mechanical system
-under floor sheet metal distribution system
University of New Mexico Research LabUniversity of New Mexico Research Lab 2005
-38,000 sq. ft. building
-Complete HVAC and building automation systems
-Underfloor distribution system
Washington Sq. Office BuildingWashington Sq. Office Building 2005
-170 ton Air Cooled Chiller
-49 Variable Air Volume Control units
-10 Air Handling Distributions units
-85% efficiency filtration system
-Steam based Humidification
-Building Automation Control system
Claremore Medical CenterClaremore Medical Center 2005
-35,000 sq. ft. of surgical and medical care area
-Sanitary, Storm and Domestic Plumbing
-Mechanical HVAC systems
-Certified medical Gas Piping
Net Shape IncNet Shape Inc 2005
-80,000 sq. ft. Industrial Plant
-Installed new HVAC and Building Automation system for office area
-Installed Fresh Air & Ventilation for Plant area
Virginia Eye CenterVirginia Eye Center 2005
-Sanitary, Storm and Domestic Plumbing systems
-Mechanical HVAC and Control package
-Certified Medical Gas Piping
Kent Intermediate School DistrictKent Intermediate School District 2005
-Retrofitted building HVAC system
-Installed shop Dust Collection system
-Upgraded existing sanitary and domestic plumbing
Potter's House Christian High SchoolPotter's House Christian High School 2002
Building Remodel, sheet metal duct, plumbing
Thornapple Elementary SchoolThornapple Elementary School 2003
Install chiller, pumps, piping, boiler heat controller
Cooley Law BuildingCooley Law Building 2003
-120,000 sq. ft. of academic classrooms
-Installed 300 ton HVAC system
-90 Heat Pump Zone Control units
-DDC Building Automation System
Highland Chrysler-JeepHighland Chrysler-Jeep 2003
Install a Trane split unit
Grand Rapids Public - Franklin SchoolGrand Rapids Public - Franklin School 2001
Building remodel, hydronics, HVAC
Grand Rapids Police Department 39 MonroeGrand Rapids Police Department 39 Monroe 2001
Building remodel install 15 ton units, split units, ductwork
Kent County CourthouseKent County Courthouse 2000
Install building controls
Gerald R. Ford MuseumGerald R. Ford Museum 2003
Install HVAC, hydronics, plumbing, building control system