![]() | Forest Hills Eastern High and Middle 2004 This project won a 2005 Associated Builders and Contractors Award of Excellence. This project was unique in many ways. It consisted of four different phases totaling 312,000 square feet that utilized a number of mechanical rooms located throughout the school. The boiler room contained five "Thermo Solution" high efficiency boilers rated at 2 million BTU's each. The 32 ton York chiller that serves the complex is a packaged air-cooled outdoor unit located outside the boiler room along with three thermal ice storage tanks. The main mechanical room is located on the mezzanine level and measurees 200' long x 25' wide x 28' high. The unique size of this room required extensive planning from all trades to install mulitple systems in a four tier layered arrangement. Supporting these mechanical layers while maintaining federal safety standards was a challenge in itself. Also, the main mechanical room housed the bulk of the air handling distribution system, which consisted of seven York "AirPak" double-wall air handlers that had to be rolled in from one end and ten set in place. Pleune also instaled five "Des Champs" energy recovery ventilation units in this area to meet the necessary fresh air requirements. This project was designed to meet or exceed LEED certification standards for materials and installation procedures. |
![]() | TRW 2005 -Upgrade building ventilation system -Replace six(6) 40,000 CFM make-up air units |
![]() | Pharmacia 2005 -30,000 sq. ft. Research & Development lab -HVAC mechanical system -under floor sheet metal distribution system |
![]() | University of New Mexico Research Lab 2005 -38,000 sq. ft. building -Complete HVAC and building automation systems -Underfloor distribution system |
![]() | Washington Sq. Office Building 2005 -170 ton Air Cooled Chiller -49 Variable Air Volume Control units -10 Air Handling Distributions units -85% efficiency filtration system -Steam based Humidification -Building Automation Control system |
![]() | Claremore Medical Center 2005 -35,000 sq. ft. of surgical and medical care area -Sanitary, Storm and Domestic Plumbing -Mechanical HVAC systems -Certified medical Gas Piping |
![]() | Net Shape Inc 2005 -80,000 sq. ft. Industrial Plant -Installed new HVAC and Building Automation system for office area -Installed Fresh Air & Ventilation for Plant area |
![]() | Virginia Eye Center 2005 -Sanitary, Storm and Domestic Plumbing systems -Mechanical HVAC and Control package -Certified Medical Gas Piping |
![]() | Kent Intermediate School District 2005 -Retrofitted building HVAC system -Installed shop Dust Collection system -Upgraded existing sanitary and domestic plumbing |
![]() | Potter's House Christian High School 2002 Building Remodel, sheet metal duct, plumbing |
![]() | Thornapple Elementary School 2003 Install chiller, pumps, piping, boiler heat controller |
![]() | Cooley Law Building 2003 -120,000 sq. ft. of academic classrooms -Installed 300 ton HVAC system -90 Heat Pump Zone Control units -DDC Building Automation System |
![]() | Highland Chrysler-Jeep 2003 Install a Trane split unit |
![]() | Portland City Hall 1999 Install HVAC |
![]() | Grand Rapids Public - Franklin School 2001 Building remodel, hydronics, HVAC |
![]() | Grand Rapids Police Department 39 Monroe 2001 Building remodel install 15 ton units, split units, ductwork |
![]() | Kent County Courthouse 2000 Install building controls |
![]() | Gerald R. Ford Museum 2003 Install HVAC, hydronics, plumbing, building control system |